Home Platform Services Company Contact
Business inquiry
Home / Platform

NVIDIA DGX B300

Frontier compute,
on Malaysian soil.

A Phase 1 pod of four DGX B300 systems, scaling to a 16-system cluster — sovereign-grade accelerated infrastructure for regulated AI workloads.

144 PFLOPS
FP4 inference / system
2.3 TB
HBM3e / system
4 → 16
DGX B300 systems
100%
In-country residency

Why this platform

The numbers our workloads require.

144PFLOPS
FP4 inference per systemSustains thousands of concurrent inference sessions with sub-second response for clinical and agentic workloads.
2.3TB
HBM3e GPU memory per systemHolds 400B+ parameter models and full-volume 3D imaging datasets in GPU memory, removing storage I/O bottlenecks.
50×
Throughput per megawattHigher useful work per watt than prior generations — directly improving operating margin and sustainability position.
16NODES
SuperPOD scale-out architectureReference-architecture scaling from a 4-system pod to a 16-system cluster without re-platforming.
ArchitectureNVIDIA SuperPOD reference design
Per system8 × Blackwell Ultra GPUs · 2.3 TB HBM3e
Phase 1 pod4 systems · 576 PFLOPS FP4 · 9.2 TB HBM3e
Target cluster16 systems · 2.3 EFLOPS FP4 · 36.8 TB HBM3e
FabricNVIDIA Quantum InfiniBand fabric
SoftwareNVIDIA AI Enterprise · Base Command · container orchestration

Configurations follow NVIDIA reference architecture and final acceptance criteria.

Clinical imaging & AI diagnostics Real-time patient-facing AI agents Drug discovery & molecular dynamics Genomic model training Enterprise LLM fine-tuning

Procurement plan

Phased by design.

Four systems in Phase 1, scaling to a 16-system target configuration — each stage gated on facility readiness, acceptance testing and customer demand.

Phase 1 — Initial order

4 × NVIDIA DGX B300

32 Blackwell Ultra GPUs · ~576 PFLOPS FP4 · ~9.2 TB HBM3e. Production pod for first customer workloads and platform validation.
Target build-out

16 × NVIDIA DGX B300

128 Blackwell Ultra GPUs · ~2.3 EFLOPS FP4 · ~36.8 TB HBM3e. Full cluster serving ASEAN healthcare, pharma and research customers.
Stage 1

Order & qualification

Phase 1 purchase order for 4 systems; vendor and distributor qualification; export and import documentation.

Stage 2

Delivery & commissioning

Facility readiness, power and cooling validation, rack and stack, InfiniBand fabric bring-up, acceptance testing.

Stage 3

Production & expansion

Customer onboarding on the 4-system pod, then staged expansion to 16 systems subject to demand and financing.

Partner engagement

From allocation
to acceptance.

NEURIZN's Phase 1 proposal is prepared for NVIDIA and authorised distribution partners. Three workstreams move it from allocation to production.

01 · Allocation

Allocation & quotation

Confirm allocation for 4 × DGX B300 under Phase 1, with a reservation pathway to 16 systems; formal quotation and lead-time commitment requested.

02 · Enablement

Partner enablement

Introduction to the authorised distribution and integration partner for Malaysia, plus NVIDIA Enterprise Support and software entitlement scope.

03 · Alignment

Technical alignment

Joint review of facility specification, SuperPOD reference architecture and acceptance-test criteria ahead of purchase order.

High-density GPU data centre racks
High-density GPU halls

Engineered for 50 kW per rack: redundant power, liquid-assisted cooling and physical security.

Deployment & operating readiness

Facility, fabric,
and compliance.

The facility, network, compliance and support framework supporting the DGX B300 cluster.

01

Power & cooling

High-density rack provisioning with redundant feeds and liquid-assisted cooling sized for the DGX B300 thermal envelope. Facility partner and power capacity allocation to be confirmed [TBC].

02

Data compliance

Workloads processed in-country under Malaysia PDPA; healthcare customers supported with pseudonymisation, consent handling and full audit logging.

03

Network fabric

NVIDIA Quantum InfiniBand compute fabric plus redundant high-speed carrier uplinks for customer access and cross-border research collaboration.

04

Security

Physical access control, network segmentation per tenant, encryption at rest and in transit, and documented change management.

05

Storage & platform

High-throughput parallel storage tier with NVIDIA AI Enterprise, Base Command and container orchestration for multi-tenant scheduling.

06

Availability & support

Target high-availability operations with NVIDIA Enterprise Support subscription, spare-parts strategy and 24/7 monitoring. SLA tiers to be finalised [TBC].

Technical specification

The pod, on one page.

Architecture
NVIDIA SuperPOD reference design; scale from a 4-system pod to a 16-system cluster
Compute per system
8 × Blackwell Ultra GPUs; 144 PFLOPS FP4 inference
Memory per system
2.3 TB HBM3e — 400B+ parameter models in GPU memory
Phase 1
4 systems; 32 GPUs; ~576 PFLOPS FP4; ~9.2 TB HBM3e
Target build-out
16 systems; 128 GPUs; ~2.3 EFLOPS FP4; ~36.8 TB HBM3e
Fabric
NVIDIA Quantum InfiniBand; redundant high-speed carrier uplinks
Software
NVIDIA AI Enterprise · Base Command · container orchestration
Facility
High-density racks up to 50 kW per rack; redundant power and liquid-assisted cooling
Data residency
Processed in-country, Malaysia PDPA compliant
Support
NVIDIA Enterprise Support, spare-parts strategy and 24/7 monitoring; SLA tiers [TBC]

Scope your workload

Start with one pod.

Tell us the model size, residency requirement and target date — we will return a compute configuration and deployment plan.